SW Corridor Tech Plan Development Services

TriMet

Portland, OR

2019 to 2020

Project Scope

The Southwest Corridor Light Rail Project would connect Downtown Portland and Tualatin with a 30-minute travel time and bring high-capacity transit to one of the region’s most congested corridors. The project includes 13 stations along the 11-mile alignment as well roadway, bicycle and pedestrian improvements throughout the corridor.

Roles & Responsibility

- Oversight and tracking of project deliverables – including Utility Conflict Matrix and Conflict Maps
- Cost estimate reporting
- Road Design
- Impact plan to existing roadways and utility structures
- Drafting support
- LRT Substation and Communication Building Site Design and Coordination